A Saturday busy bee was organised on 16 July 2022 to complete the removal of the old G Gauge pond structure — with generous assistance of Rail Heritage with the use of their front-end loader to the bulk of the heavy lifting!
A selection of photos from the day of activity courtesy of Garry West.
![](https://wamrc.org.au/wp-content/uploads/2022/08/IMG_8657-rotated.jpg)
![](https://wamrc.org.au/wp-content/uploads/2022/08/IMG_8659.jpg)
![](https://wamrc.org.au/wp-content/uploads/2022/08/IMG_8662.jpg)
![](https://wamrc.org.au/wp-content/uploads/2022/08/IMG_8663.jpg)
![](https://wamrc.org.au/wp-content/uploads/2022/08/IMG_8664.jpg)
![](https://wamrc.org.au/wp-content/uploads/2022/08/IMG_8665.jpg)
![](https://wamrc.org.au/wp-content/uploads/2022/08/IMG_8666.jpg)